3704 Outpost Trail, McKinney, TX 75071
4 bd 3 ba 2,486 sq ft House · Built 2026
About this home
MLS# 21413861 - Built by Tri Pointe Homes - Ready Now! ~ Discover the Victoria floor plan, where thoughtful design meets elevated everyday living. The beautifully appointed kitchen features a GE 36-inch cooktop with convenient pot and pan drawers below, a built-in cabinet enclosure housing the microwave and GE 30-inch single wall oven, and a decorative wood hood with a vent hood insert. The primary suite offers two generous walk-in closets for ample storage, while the versatile upstairs flex space creates room for a home office, fitness area or private lounge tailored to your lifestyle.
Features
- Inside: DoubleVanity,HighSpeedInternet,KitchenIsland,OpenFloorplan,SmartHome,CableTv,WiredForData,WalkInClosets
- Outside: RainGutters
- Appliances: SomeGasAppliances,Dishwasher,Disposal,GasWaterHeater,Microwave,PlumbedForGas,TanklessWaterHeater,VentedExhaustFan
- Parking: Garage,GarageDoorOpener,GarageFacesRear
- Laundry: WasherHookup,ElectricDryerHookup,LaundryInUtilityRoom
Where it is
Similar homes in McKinney
Listing information comes from the North Texas Real Estate Information Systems (NTREIS) IDX program and is deemed reliable but not guaranteed. Price and status can change; the listing agent has the latest.
Talk to a Realtor
We'll connect you with a local Realtor who can get you in to see this home.
Create an account to save this house
And so much more…
- Keep your saved homes on every device
- Build open-house tours and get the best driving route
- Alerts when new homes match what you like
- One tap to a local Realtor when you're ready to see one
Are you a Realtor? Log in here