‹ Back to Price Finder

$1,040,688 Under contract

8741 Porch Place, McKinney, TX 75071

5 bd 6 ba 4,014 sq ft House · Built 2026

Price / sq ft$259
StatusUnder contract
HOA$900
Lot0.24 acres
Built2026
Garage3-car
Stories2
HeatingCentral,EnergyStarQualifiedEquipment,Fireplaces,NaturalGas
CoolingCentralAir,Electric,EnergyStarQualifiedEquipment,HumidityControl,Zoned
SchoolsProsper ISD
ElementaryMike and Janie Reeves
SubdivisionEliana
MLS #21386330

About this home

SOUTHGATE HOMES ASHLAND III floor plan. The Ashland III with 5 beds, 5.5 baths is the perfect fit for family and friends.

Features

  • Inside: BuiltInFeatures,DecorativeDesignerLightingFixtures,DoubleVanity,HighSpeedInternet,KitchenIsland,OpenFloorplan,Pantry,SmartHome,CableTv,VaultedCeilings,WiredForData,WalkInClosets,WiredForSound
  • Outside: Lighting,PrivateYard,RainGutters
  • Appliances: SomeGasAppliances,ConvectionOven,DoubleOven,Dishwasher,GasCooktop,Disposal,GasWaterHeater,Microwave,PlumbedForGas,SomeCommercialGrade,TanklessWaterHeater,VentedExhaustFan
  • Parking: DoorSingle,Driveway,GarageFacesFront,Garage,GarageDoorOpener,InsideEntrance,KitchenLevel,Lighted,Tandem
  • Laundry: WasherHookup,ElectricDryerHookup,LaundryInUtilityRoom

Where it is

Similar homes in McKinney

$1,099,000$274 / sq ft

4 bd · 3 ba · 4,016 sf

804 Lakewood Drive, McKinney

View details ›
$905,517$229 / sq ft

5 bd · 5 ba · 3,951 sf

4012 Bentsen Street, McKinney

View details ›
$850,000$192 / sq ft

5 bd · 5 ba · 4,438 sf

1704 Keswick Drive, McKinney

View details ›

Listing information comes from the North Texas Real Estate Information Systems (NTREIS) IDX program and is deemed reliable but not guaranteed. Price and status can change; the listing agent has the latest.